Presidio Middle School Link to this section
Site map Link to this section
Presidio Middle School, founded in 1930, is located in the Richmond district in close proximity to Golden Gate Park and the Pacific Ocean. We are committed to delivering a rigorous standards based education of the highest quality to all students and have been successful in meeting this challenge with a multicultural population of diverse socioeconomic backgrounds. The administration and staff work together to provide a safe and nurturing environment, and establish policies and procedures in which both the students and teachers can perform to their maximum capabilities.
Refreshed Classrooms
Main Hallway Upgrades
Interior Renovations
Exterior Site Improvements
This unique, privately funded schoolyard is the product of a collaborative design process. Imagined by students, their vision nurtured by local artists, this project was brought to life by converting 84,000 sf of city block asphalt to a campus that provides a variety of outdoor spaces to encourage play and innovation.
General Information
Link to this section
Project Details
Architect: |
K2A Architecture and Interiors |
General Contractor: | Zolman |
Construction Manager: | Vanir Construction Management, Inc. |
Bid Amount (Hard Cost): | $13,443,050 |
Change Order Amount: | $1,937,792 (14.41% of bid amount) |
Final Contract Amount: | $15,380,842 |
Project Description
Complete school modernization including:
- ADA compliance, fire/life safety upgrades including the replacement of fire alarm system
- Voluntary structural upgrades
- Infrastructure upgrades including communications, data network and security systems
- New passenger elevator and wheelchair lift
- Hazardous material/asbestos/lead remediation
- Installation and removal of interim housing
New schoolyard funded by Salesforce, Inc.
The courtyard hosts a new steel trellis with colorful polycarbonate “leaves” for shade and a synthetic turf lawn for lunchtime relaxation; the lower yard is fully abated and provides sports courts and a bike storage building that is integrated into terraced seating leading to the upper yard. The upper terrace is enhanced with custom shade trees made of steel and colorful polycarbonate disks and permeable pavers; new play equipment includes a climbing tree and pullup structure adjacent to a new track and synthetic turf field. Trees and planting have been added throughout along with raised beds for outdoor gardening opportunity.