2019 Invitation for Bids
Marina Middle School Bond Modernization | 11/12/2019 | 12/17/2019 |
JAMF Casper Software License, Management & Support
|
11/15/2019 | 12/02/2019 |
SFUSD L4E Device Sale
|
11/13/2019 | 12/13/2019 |
Ulloa Elementary School Window Replacement, Phase II | 11/12/2019 | 12/10/2019 |
555 Franklin Street 2nd Floor, LEAD Department - Electrical Connections of New Cubicles | 11/27/2019 | 12/04/2019 |
Claire Lilienthal 3-8 (Scott Campus) Soil Improvement & Restroom Interim Housing | 10/28/2019 | 12/03/2019 |
Dairy Products
|
10/30/2019 | 11/25/2019 |
Tule Elk Park Early Education School Modernization | 10/23/2019 | 11/19/2019 |
Culinary Arts Modernization at John O'Connell School of Technology | 10/11/2019 | 11/12/2019 |
Cap, Gown, Tassel, and Medallion
|
09/04/2019 | 09/30/2019 |
Garfield Elementary School Modernization | 08/15/2019 | 09/12/2019 |
Clarendon Elementary School Modernization and Classroom Building | 07/08/2019 | 08/13/2019 |
Paint and Painting Supplies
|
07/12/2019 | 08/08/2019 |
Hillcrest Elementary School Modular Building | 04/22/2019 | 05/21/2019 |
SFUSD Science Core Curriculum 2019-2020 Printing Job
|
04/19/2019 | 05/10/2019 |
SFUSD Chemistry Core Curriculum 2019-2020 Kit Material Job
|
04/18/2019 | 05/09/2019 |
Chinese Immersion School Asphalt Replacement | 04/05/2019 | 05/10/2019 |
School of the Arts Security Improvements | 04/05/2019 | 05/10/2019 |
Las Americas EEC Exterior Stair Addition | 04/24/2019 | |
Lowell High School LIbrary Modernization | 03/19/2019 | 04/24/2019 |
Harvey Milk Elementary School Modernization | 03/25/2019 | 04/23/2019 |
Spring Valley Elementary School Prop 39 Upgrades | 03/08/2019 | 04/05/2019 |
Francisco Middle School Prop 39 Upgrades | 03/08/2019 | 04/04/2019 |
Clock/PA Systems Project at June Jordan School for Equity & City Arts & Tech High School | 03/05/2019 | 04/04/2019 |
Play Yard Improvements at Guadalupe Elementary School | 03/05/2019 | 04/04/2019 |
Longfellow ES Exit Balcony Additions | 03/04/2019 | 04/02/2019 |
George Washington High School Voluntary Seismic Strengthening | 02/21/2019 | 03/26/2019 |
Seismic Retrofit-Soil Improvements at Marina MS | 01/30/2019 | 03/26/2019 |
Lafayette Elementary School Modernization | 02/19/2019 | 03/19/2019 |
Dr. Charles Drew Elementary School Modernization and Interim Housing Project | 02/11/2019 | 03/12/2019 |
Tenderloin ES PA / Clock System Install | 02/06/2019 | 03/12/2019 |
Claire Lilienthal School Furniture, Assembly, & Installation | 02/07/2019 | 03/01/2019 |
Hillcrest ES Interim Housing | 01/30/2019 | 02/26/2019 |
McAteer EED Kitchen Modernization | 01/07/2019 | 02/14/2019 |
SF International HS Prop 39 | 1/17/2019 | 2/13/2019 |
Clarendon Elementary School Interim Housing | 01/14/2019 | 02/12/2019 |
Lowell High School Student Union Classroom | 01/02/2019 | 02/06/2019 |
El Dorado ES and Junipero Serra ES Green Schoolyard | 01/08/2019 | 02/05/2019 |
2018 Invitations for Bids
REBID Tule Elk Park Early Education School Demolition and Abatement Project | 12/10/2018 | 01/08/2019 |
Lafayette Elementary School Interim Housing | 11/13/2018 | 12/12/2018 |
Tule Elk Park Early Education School Demolition and Abatement Project | 11/02/2018 | 12/04/2018 |
Roofing Repairs and Recoating at the Nourse Gym | 10/19/2018 | 11/09/2018 |
Ulloa Elementary School Window Replacement | 10/05/2018 | 11/15/2018 |
Herbert Hoover Middle School - Building A, B & C HVAC Project | 09/13/2018 | 10/16/2018 |
Convection Ovens
|
09/06/2018 | 09/21/2018 |
JAMF Casper Software Licenses, Maintenance & Support
|
08/22/2018 | 09/05/2018 |
Garfield Elementary School - Demolition Project | 08/13/2018 | 09/11/2018 |
Cisco UCS
|
07/25/2018 | 08/08/2018 |
EMC Unity
|
07/25/2018 | 08/08/2018 |
Prefabricated Modular Restroom at Lakeshore Alternative Elementary School | 06/20/2018 | 07/25/2018 |
Janitorial Paper Products and Supplies
|
05/03/2018 | 05/24/2018 |
SFUSD Science Core Curriculum 2018-2019 Printing Job
|
05/02/2018 | 05/23/2018 |
SFUSD Science Core Curriculum 2018-2019 Kit Material & Printing Job
|
05/02/2018 | 05/23/2018 |
F5 Network Big-IP Switch Equipment, Licenses and Services
|
04/18/2018 | 05/02/2018 |
Spring Valley ES Prop 39: HVAC & Control Upgrades | 04/17/2018 | 05/14/2018 |
1235 Mission Street Shell and Core Improvements Scope 5 Elevators | 04/04/2018 | 05/11/2018 |
Noriega Early Education School ADA Site Improvements of Upper Yard | 04/10/2018 | 05/08/2018 |
REBID - Robert Louis Stevenson ES Green Schoolyard and Stormwater Management Project | 04/09/2018 | 05/03/2018 |
Paper Products and Kitchen Supplies | 04/04/2018 | 05/02/2018 |
Herbert Hoover Middle School - Building A, B & C HVAC Project | 04/04/2018 | 05/01/2018 |
Jefferson ES Security & Prop 39 Energy Upgrades | 04/10/2018 | 04/27/2018 |
Spring Vallley ES Prop 39 Lighting Upgrades | 04/03/2018 | 04/27/2018 |
1235 Mission Street Office Building Shell and Core Improvements Scope 4 Fire Alarm | 04/04/2018 | 04/24/2018 |
Frank McCoppin ES Existing Retaining Wall Rehabilitation | 03/19/2018 | 04/17/2018 |
Frank McCoppin ES and John Yehall Chin ES Green Schoolyard | 03/19/2018 | 04/17/2018 |
Francisco MS Prop 39 Energy Efficiency Upgrades | 03/14/2018 | 04/11/2018 |
RE-BID Prop 39 Energy Efficiency at Alvarado ES | 03/14/2018 | 04/10/2018 |
Claire Lilienthal (Scott Campus) 3-8 School - New Classroom & Gymnasium Building & 2018 Interim Housing Relocatables Project | 03/07/2018 | 04/09/2018 |
Robert Louis Stevenson ES Green Schoolyard and Stormwater Management | 03/05/2018 | 04/03/2018 |
Lawton Alternative Elementary School, Prop 39 Electrical Upgrades & PA System | 02/15/2018 | 03/21/2018 |
SF Community School Library and Office Building Prefabricatded Modular Building on Custom Foundation with Site Improvements | 02/15/2018 | 03/14/2018 |
Raphael Weill Early Education School Structural Strengthening | 02/12/2018 | 03/13/2018 |
Dr. Charles Drew Elementary School Wall Project | 020/05/2018 | 03/06/2018 |
Alvarado ES Prop 39 Energy Efficiency | 02/06/2018 | 03/01/2018 |
Window Shades Replacement at John O'Connell School of Technology | 01/31/2018 | 02/22/2018 |
Prop 39 Energy Measures at Lowell High School | 01/17/2018 | 02/13/2018 |
Tule Elk Park Early Education School Interim Housing | 01/16/2018 | 02/13/2018 |
New Traditions ES Prop 39 Energy Efficiency Upgrades | 01/12/2018 | 02/06/2018 |
Structural Seismic Retrofit at Marina Middle School | 01/09/2018 | 01/16/2018 |
Lowell High School Student Union Classroom | 01/03/2018 | 01/30/2018 |
2017 Invitations for Bids
Find all the archived Invitations for Bids
Invitation for Bids |
Date Posted |
Open Date |
---|---|---|
Shell and Core Improvements - 1235 Mission Street - Project No.: 11860.5
|
12/08/2017 | 01/05/2018 |
Shell and Core Improvements - 1235 Mission Street - Project No.: 11860.3
|
12/08/2017 | 01/04/2018 |
Shell and Core Improvements - 1235 Mission Street - Project No.: 11860.2
|
12/08/2017 | 01/04/2018 |
Shell and Core Improvements - 1235 Mission Street - Project No.: 11860.1
|
12/08/2017 | 01/04/2018 |
George Washington High School, Expansion of Auto Shop Program
|
11/20/2017 | 12/18/2017 |
Telecom Equipment Maintenance
|
11/17/2017 | 12/27/2017 |
Food and Food Supplies
|
11/07/2017 | 12/22/2017 |
Relocatable Replacement Project @ Rooftop ES - Burnett Campus
|
11/01/2017 | 11/28/2017 |
SFUSD Science Core Curriculum 2017-2018 Lab Equipment
|
10/03/2017 | 10/13/2017 |
Jamf Casper Software License & Maintenance
|
09/15/2017 |
09/29/2017 |
SFUSD Science Core Curriculum 2017-2018 Lab Equipment
|
09/12/2017 | 09/26/2017 |
Lowell High School Window Replacement
|
08/28/2017 | 10/10/2017 |
Window Replacement @ Marina Middle School
|
08/21/2017 | 09/13/2017 |
SFUSD Student And Family Handbooks 2017-2018
|
05/26/2017 | 06/09/2017 |
Operation Vehicles Fleet
|
05/22/2017 | 06/05/2017 |
XEROGRAPHIC PAPER
|
05/17/2017 | 05/31/2017 |
SFUSD Science Core Curriculum Print and Kit Materials
|
05/15/2017 | 05/31/2017 |
SFUSD Math Core Curriculum Print Materials
|
05/15/2017 | 05/31/2017 |
SWEEPER VEHICLE EQUIPMENT
|
05/09/2017 | 05/26/2017 |
JANITORIAL PAPER SUPPLIES
|
05/09/2017 | 05/26/2017 |
LOCKSMITH HARDWARES
|
05/09/2017 | 05/23/2017 |
Auditorium Theatrical Upgrades @ Thurgood Marshall High School
|
04/24/2017 | 05/17/2017 |
Re-Roofing at Lawton Alternative School & at Thurgood Marshall High School
|
04/26/2017 | |
Raoul Wallenberg High School Theater Renovation
|
03/30/2017 | 04/27/2017 |
June Jordan School for Equity Security Cameras & Science Classrooms Improvements
|
03/27/2017 | 04/20/2017 |
Junipero Serra ES Addition and Modernization
|
03/13/2017 | 04/11/2017 |
Security Improvements at Bessie Carmichael ES & Bessie Carmichael/Filipino Education Center MS
|
03/06/2017 | 04/06/2017 |
Abraham Lincoln HS Building-A Re-Roofing
|
03/13/2017 | 04/05/2017 |
Marshall ES Roof Tile Replacement & Cafeteria Re-Roofing
|
03/13/2017 | 04/05/2017 |
Paul Revere ES & Visitacion Valley ES Green Schoolyard
|
02/27/2017 | 03/30/2017 |
SF Community School Library and Office Building Prefabricated Modular Building
|
03/06/2017 | 03/29/2017 |
Jose Ortega ES & Longfellow ES Green Schoolyard
|
02/27/2017 | 03/29/2017 |
Herbert Hoover MS Seismic Strengthening
|
02/21/2017 | 03/28/2017 |
Daniel Webster ES & McKinley ES Green Schoolyard
|
02/27/2017 | 03/28/2017 |
Prop 39 Energy Measures Pkg 1B at Cabrillo, Sunset ES, Ulloa ES
|
02/27/2017 | 03/23/2017 |
Prop 39 Energy Measures Pkg 1A at Mission Ed Center & Rooftop Mayeda Campus
|
02/27/2017 | 03/23/2017 |
Redding Elementary Schoo Modernization - REBID (2016 Prequalification Project)
|
02/14/2017 | 03/21/2017 |
Cap, Gown, Tassel, and Medallion
|
02/14/2017 | 03/02/2017 |
Window Replacement & Seismic Retrofit at Marina Middle School
|
02/13/2017 | 03/8/2017 |
Sanchez ES - Structural Upgrade
|
02/06/2017 | 02/28/2017 |
Rooftop Burnett Campus New Prefabricated Relocatable Classrooms
|
02/01/2017 | 02/28/2017 |
Jean Parker ES Roof Deck Resurfacing Project
|
01/13/2017 | 02/08/2017 |
Auditorium Theatrical Upgrade at Herbert Hoover Middle School
|
01/13/2017 | 02/09/2017 |
Rooftop Burnett Campus Prefabricated Modular Buildings
|
01/04/2017 | 01/26/2017 |
2016 Invitations for Bids
Find all the archived Invitations for Bids
Invitation for Bids |
Date Posted |
Open Date |
---|---|---|
Redding Elementary School Modernization (2016 Prequalification Project)
|
12/19/2016 | 01/24/2017 |
Work Fleet Vehicles
|
||
Vegetation Fire Abatement Services IFB No. 061-24110101-2019
|
11/01/2016 | |
Dairy Products
|
11/01/2016 | 11/29/2016 |
State A.B. 211 Door Lockset Replacement @ Various Sites Bid Package 5
|
10/28/2016 | 11/23/2016 |
Telecom Equipment Maintenance Bid IFB No. 068-12272019-2016
|
10/25/2016 | |
|
10/04/2016 | 10/25/2016 |
George Washington Carver ES Window and Partition Replacement
|
10/04/2016 | 10/25/2016 |
El Dorado Elementary School Modernization
|
09/20/2016 | 10/25/2016 |
|
09/15/2016 | 09/30/2016 |
|
08/23/2016 |
09/08/2016 |
Expansion of Enrollment Centers at 555 Franklin Admin Building & HVAC System Repair at 601 McAllister Building
|
07/20/2016 | 08/16/2016 |
Junipero Serra Elementary School Classroom Addition - Rebid
|
06/27/2016 | 07/26/2016 |
Tule Elk Park EES Steam Condensate Return Pump Replacement & Asbestos Abatement
|
06/24/2016 | 07/26/2016 |
Hoover Middle School Auditorium Tech Upgrade
|
06/27/2016 | 07/20/2016 |
Junipero Serra Elementary School Classroom Addition
|
05/16/2016 | 06/14/2016 |
Lighting System Repairs and Upgrades at George Washington HS Auditorium
|
05/23/2016 | 06/10/2016 |
RUCKUS Network Hardware Bid 2016
|
05/17/2016 | 05/31/2016 |
Lowell HS Wireless Upgrade Project
|
05/06/2016 | 05/27/2016 |
SFUSD Student and Family Handbooks 2016-17
|
05/10/2016 | 05/24/2016 |
EMC Backup Software & Hardware Bid 2016
|
05/10/2016 | 05/24/2016 |
El Dorado Elementary School Interim Housing
|
05/02/2016 | 05/24/2016 |
SFUSD Core Curriculum 2016-17 Print Materials
|
05/05/2016 | 05/20/2016 |
Jean Parker ES Roof Deck Resurfacing
|
||
Food and Food Supplies FSB-070116
|
04/19/2016 | 05/19/2016 |
ADA Site Improvements of Play Yard @ Malcolm X Academy EES
|
04/25/2016 | 05/18/2016 |
Mission High School Play Field Turf Replacement
|
04/06/2016 | 05/10/2016 |
Roofing & Waterproofing Project @ Lincoln High School
|
04/12/2016 | 05/06/2016 |
Restroom Addition, Yard Paving, P.A. & Clocks @ Fairmount Elementary School
|
04/06/2016 | 05/04/2016 |
Integrated Pest Management IPM-040116
|
04/07/2016 | 05/03/2016 |
Security Improvements @ Cdr Sloat & Claire Lilienthal ES (Madison & Scott Campuses)
|
04/01/2016 | 04/28/2016 |
Galileo High School Window Replacement
|
04/01/2016 | 04/27/2016 |
1551 Newcomb Ave. Public Address System
|
04/21/2016 | 04/26/2016 |
Abraham Lincoln HS Wellness Center at Room 126
|
04/21/2016 | 04/26/2016 |
Philips HeartStart FRx AEDs, batteries and electrode pad IFB No. 0000014172
|
04/12/2016 | 04/25/2016 |
West Portal Elementary School Reroofing & Painting
|
04/11/2016 | 04/22/2016 |
Reroofing & Waterproffing Projects @ Lafayette ES, C Lilienthal ES, & Star King ES
|
04/05/2016 | 04/21/2016 |
Lowell High School Furniture & Installation Bid
|
03/22/2016
|
04/06/2016 |
Robert L. Stevenson Elementary School Modernization
|
03/07/2016 | 04/05/2016 |
Miraloma ES & Sunnyside ES Green Schoolyard
|
02/29/2016 | 03/31/2016 |
AP Giannini MS - Remediation of Leaking Cafeteria Window Wall & Deck
|
03/04/2016 | 03/30/2016 |
Balboa High School Computer Lab Renovations
|
03/09/2016 | 03/30/2016 |
Lawton ES and Lafayette ES Security Cameras Project
|
03/09/2016 | 03/30/2016 |
Track & D-Zones & Fitness Equipment Pad at Lowell HS & Softball Field at Burton HS
|
02/29/2016 | 03/29/2016 |
Frank McCoppin Elementary School Modernization
|
02/29/2016 | 03/29/2016 |
Cesar Chavez ES & Monroe ES Greening
|
02/29/2016 | 03/29/2016 |
Roosevelt Middle School Boiler Replacement
|
02/29/2016 | 03/29/2016 |
Demolition of Annex Bldgs at Youth Park
|
02/23/2016 | 03/24/2016 |
Gordon J. Lau Elementary School Roofing and Windows Replacement
|
02/22/2016 | 03/23/2016 |
John Yehall Chin Elementary School Modernization
|
02/22/2016 | 03/22/2016 |
Facade Column Replacement & Repair Project Jean Parker ES
|
1/12/2016 | 2/09/2016 |
James Lick Middle School Classroom Furniture IFB # 024-12571-016F
|
12/22/2015 | 01/19/2016 |
Fresh Produce FP-151002
|
12/08/2015 | 01/05/2016 |
2015 Invitations for Bids
Find all the archived Invitations for Bids
Invitation for Bids |
Date Posted |
Open Date |
---|---|---|
Vending Machines VM-151202
|
12/08/2015 | 12/28/2015 |
Window Replacement at Claire Lilienthal, Winfield Scott Campus
|
12/01/2015 | 01/12/2016 |
Window Replacement at James Denman Middle School
|
11/06/2015 | 12/16/2015 |
Lakeshore ES Window Replacement
|
11/09/2015 | 12/15/2015 |
Sutro ES Window Replacement
|
11/09/2015 | 12/15/2015 |
Invitation to Register for SFUSD CUPCCAA Program
|
11/02/2015 | 11/30/2015 |
Multilingual Signage at Various (Newcomer Pathway High Schools )
|
10/28/2015 | 11/18/2015 |
Fresh Produce FP-151001
|
10/06/2015 | 11/03/2015 |
555 Franklin Street - IT Cooling Project
|
10/02/2015 | 10/22/2015 |
JAMF Casper Suite Software License_Maintenance Bid
|
09/29/2015 | 10/13/2015 |
Herbert Hoover MS, Ceiling Fans, Window Film Installation and Shades Relocation
|
09/14/2015 | 10/13/2015 |
Ceramics Kiln Installations at Various Sites
|
09/14/2015 | 10/05/2015 |
ADA Site Improvements of Play Yard at Argonne EES
|
08/28/2015 | 09/23/2015 |
Security Camera System at Rooftop (Burnett) & Fairmount ES
|
08/27/2015 | 09/24/2015 |
B+G 834 Toland St. Telecom Project
|
07/30/2015 | 09/01/2015 |
Janitorial Paper Products and Supplies
|
06/30/2015 | 07/14/2015 |
Work Fleet Vehicles
|
06/04/2015 | 06/16/2015 |
Math Core Curriculum Printing Materials Bid
|
05/26/2015 |
06/08/2015 |
Dianne Feinstein Elementary School Security Cameras Project
|
05/14/2015 | 04/24/2015 |
Transportation Services IFB TS-2015
|
05/07/2015
|
06/05/2015 |
Security Improvements @ AP Giannini Middle School
|
05/01/2015 | 05/14/2015 |
Bessie Carmichael ES Exterior Security Lighting
|
4/22/2015 | 05/08/2015 |
Meal Delivery Services MDS-2015A
|
04/21/2015 |
05/19/2015 |
Tenderloin Community School & West Portal ES Security Cameras Project
|
04/20/2015 | 05/12/2015 |
Tenderloin ES Basement and Play Yard Waterproofing
|
04/20/2015 | 05/26/2015 |
Re-Roofing Lower Roof at Student Nutrition Services Facility
|
04/14/2015 | 05/06/2015 |
Everett Middle School and Lilienthal Elementary School Boiler Replacements - Re-bid
|
04/10/2015 | 05/05/2015 |
Reroofing Project at Aptos Middle School
|
04/07/2015 | 04/28/2015 |
Metal Painting at Exterior Walkways for Alice Fong Yu
|
03/30/2015 | 04/23/2015 |
ADA Improvements at Leola Havard Earlier Education School
|
03/27/2015 | 04/22/2015 |
Security Improvements at Leola Havard Early Education School
|
03/27/2015 | 04/23/2015 |
ADA Site Improvement of Pre-K Play Yard at Rooftop (Burnett) & Fairmount Elementary School
|
03/24/2015 | 04/23/2015 |
Reroofing Project at Sherman Elementary School
|
03/24/2015 | 04/15/2015 |
Daniel Webster Interim Housing at Enola Maxwell
|
03/23/2015 | 04/14/2015 |
Washington HS Bridge Improvement & Downtown HS Door Landing Repair
|
03/17/2015 | 04/09/2015 |
Jefferson ES Alterations of Cafeteria + Library
|
03/06/2015 | 03/25/2015 |
Paul Revere Elementary School Modernization
|
03/02/2015 | 03/31/2015 |
Marshall Elementary School, Roof & HVAC Unit Replacement
|
03/02/2015 | 03/24/2015 |
Mission HS and Leonard Flynn ES Boiler Replacements
|
02/23/2015 | 04/07/2015 |
Everett MS and Lilienthal ES Boiler Replacements
|
02/23/2015 | 04/07/2015 |
Balboa High School Boiler Replacement
|
02/23/2015 | 04/07/2015 |
Daniel Webster Elementary School Modernization
|
02/23/2015 | 03/24/2015 |
Lakeshore Elementary School Roofing and Storefront
|
02/23/2015 | 03/19/2015 |
Visitacion Valley Middle School Modernization
|
02/17/2015 | 03/19/2015 |
Meal Delivery Services MDS-2015
|
02/17/2015 | 03/17/2015 |
Downtown HS & Dr. Martin Luther King Jr. MS Greening
|
02/02/2015 | 03/17/2015 |
Francisco MS, SF Public Montessori, Wallenberg HS Greening
|
02/02/2015 | 03/12/2015 |
Alteration of Boys Restroom for ADA Compliance at Buena Vista Horace Mann School
|
02/17/2015 | 03/11/2015 |
Everett MS Exterior Painting
|
02/03/2015 | 03/11/2015 |
Mission Education Center Window Replacement
|
02/12/2015 | 03/10/2015 |
Cleveland ES Flooring Installation
|
02/02/2015 | 03/10/2015 |
Longfellow Elementary School Modernization
|
02/09/2015 | 03/10/2015 |
Aptos MS & Herbert Hoover MS Greening
|
02/02/2015 | 03/10/2015 |
Visitacion Valley Elementary School Modernization
|
02/02/2015 | 03/03/2015 |
Pavement Resurfacing of Parking Lot at I.M. Scott Building
|
01/29/2015 | 02/24/2015 |
Everett MS Lobby and Cafeteria Flooring Instaln. Notice to Contractors Calling for Bids
|
01/20/2015 | 02/24/2015 |
Lowell HS New Classroom Buildings
|
01/06/2015 |
02/17/2015 02/18/2015 |
LAN Hardware Bid / E-Rate 2015/16
|
01/13/2015 |
02/13/2015 |
WLAN Hardware Bid / E-Rate 2015/16
|
01/13/2015 |
02/13/2015 |
Presidio MS Modernization
|
01/07/2015 | 02/10/2015 |
McKinley ES Modernization
|
01/07/2015 | 02/03/2015 |
2014 Invitations for Bids
Find all the archived Invitations for Bids
Invitation for Bids |
Date Posted |
Open Date |
---|---|---|
Principals Center Exterior Painting
|
12/10/2014 | 01/08/2015 |
Sheridan ES ADA Site Improvements of Play Yard
|
11/24/2014 | 12/16/2014 |
SOTA-AAS High School Modernization
|
11/06/2014 | 12/16/2014 |
Math Core Curriculum Printing Materials
|
10/28/2014 | 11/11/2014 |
Ida B. Wells High School Modernization
|
10/27/2014 | 11/20/2014 |
Children Administration Center - First Floor Window Replacement
|
10/21/2014 | 11/20/2014 |
MOVING & STORAGE SERVICES BID
|
10/15/2014
|
11/12/2014 |
James Lick Middle School Modernization
|
09/30/2014 | 10/28/2014 |
James Lick Middle School Interim Housing
|
09/16/2014 | 10/14/2014 |
Replacement of Corridor Lockers at James Denman MS, Phase 2
|
09/10/2014 09/18/2014 |
10/01/2014 |
Wells High School Make-Ready -O'Connell HS
|
09/04/2014 | 09/30/2014 |
Lowell HS Computer Lab Renovation
|
06/30/2014 07/11/2014 |
07/28/2014 |
State A.B.211 Door Lockset Replacement at Various Sites - Bid Package 4
|
05/20/2014 | 06/06/2014 |
Balboa High School: Tennis Court Repairs
|
05/05/2014 | 05/28/2014 |
Ruckus Network Hardware
|
04/29/2014 | 05/13/2014 |
RE-BID Replacement of Lockers at Marina MS
|
04/28/2014 | 05/15/2014 |
New Academic Campus - New Classroom Addition
|
04/28/2014 | 05/27/2014 |
Meal Delivery Services 2014
|
04/24/2014 | 05/16/2014 |
IT Phones Upgrades
|
04/21/2014 | 05/20/2014 |
Spring Valley ES Fencing Replacement
|
04/18/2014 | 05/22/2014 |
Xerographic Paper Bid 2014
|
04/15/2014 | 04/29/2014 |
Sherman ES & Yoey Campus -- Paving Repairs & Site Improvements of School Yards
|
04/10/2014 | 04/30/2014 |
Locksmith Hardwares 2014 Bid
|
04/01/2014 | 04/15/2014 |
SF Community School ADA Site Improvements of Play Yard
|
03/31/2014 | 04/22/2014 |
McAteer Campus, Miscellaneous Projects
|
03/31/2014 | 04/22/2014 |
Replacement of Lockers at Marina Middle School
|
03/27/2014 | 04/21/2014 |
Chinese Education Center ES -- Security Improvements Project
|
03/14/2014 | 04/16/2014 |
New Academic Campus - Kitchen Building Alteration
|
03/17/2014 | 04/15/2014 |
Water Bottle Filling Station Installation at Multiple School Sites
|
03/12/2014 | 04/11/2014 |
Jose Ortega ES Modernization
|
03/17/2014 | 04/08/2014 |
Cesar Chavez ES Security Surveillance System
|
03/17/2014 | 04/08/2014 |
Hillcrest ES -- Yard Paving Project
|
|
04/08/2014 |
Reroofing Project @ James Denman MS
|
|
04/02/2014 |
Bret Harte ES Exterior & ADA Improvements Project
|
02/25/2014 | 03/25/2014 |
Cisco Hardware 2014 Bid
|
02/25/2014 | 03/11/2014 |
Gordon J. Lau ES Modernization, with Commodore Stockton EES Modernization
|
02/24/2014 | 03/25/2014 |
Alteration of Classroom D & to Add a New Accessible Restroom at Lawton Alternative School
|
|
03/18/2014 |
Miraloma Elementary School Modernization
|
02/18/2014 | 03/18/2014 |
Claire Lilienthal ES (Madison & Scott Campuses) Playground Safety Surfacing | ||
|
02/14/2014 | 03/12/2014 |
Elevator Enclosure Repair @ West Portal Elementary School
|
01/31/2014 02/14/2014
|
02/26/2014 |
Roosevelt Middle School Modernization
|
01/28/2014 | 02/25/2014 |
Lowell HS Units 4 & 5, Voluntary Seismic Strengthening
|
01/21/2014 | 02/18/2014 |
New Traditions ES & A.P. Giannini MS Fence Replacement
|
1/17/2014
02/5/2014 02/26/2014 |
2/20/2014 |
Burton High School Modernization
|
01/09/2014 | 02/11/2014 |
Presidio MS Boiler Replacement - Cancelled
|
01/06/2014 | 02/06/2014 |
Sunnyside Elementary School Bungalow Replacement and Modernization
|
01/03/2014 |
02/04/2014 |
Starr King Elementary School
|
12/30/2013 | 01/30/2014 |
Re-bid of Phase 2 Modernization at Monroe Elementary School
|
12/13/2013 | 01/21/2014 |
Las Americas Early Education School ADA Site Improvements of Play Yard
|
12/12/2013 12/12/2013 |
11/26/2013 |
601 McAllister Flooring Replacement & Painting Project
|
12/20/2013
|
01/08/2014 |
2013 Invitations for Bids
Find all the archived Invitations for Bids
Invitation for Bids |
Date Posted |
Open Date |
---|---|---|
Removal of Existing Flooring & Installation of New Linoleum Flooring @ Everett MS
|
12/09/2013 12/20/2013 01/08/2014 |
01/08/2014 |
Dairy Bid D-010114
|
11/26/13 | 12/20/13 |
Relocation of the Special Education Program at 3045 Santiago Streeet
|
11/6/13
|
11/19/2013 |
RUCKUS NETWORK HARDWARE BID
|
11/21/2013 |
12/05/2013 |
Door Lockset Replacement-Package 3 (11630)
|
10/21/2013 11/1/13 11/18/13 |
11/15/2013 |
ADA Site Improvements of Play Yard at Visitacion Valley ES
|
|
10/29/2013 |
Nourse Auditorium Toilet Room Renovation
|
|
11/22/2013 |
Monroe Elementary School Modernization
|
09/16/2013 | 10/15/2013 |
New Academic Campus Modernization
|
09/09/2013 | 10/01/2013 |
CLASSROOM FURNITURE - ALAMO ES
|
08/12/2013 | 08/27/2013 |
George Peabody Elementary School Modernization
|
07/08/2013 | 08/13/2013 |
Paint and Painting Supplies
|
07/02/2013 |
07/23/2013 |
SFUSD SOQ Civil Structural Services | 07/02/2013 | 07/26/2013 |
Request for SOQ Notice for Engineering Services | 06/14/2013 | 07/12/2013 |
The Expansion of the Early Education School Program at Leola Havard School | 05/17/2013 | 06/11/2013 |
|
05/31/2013 | |
|
06/12/2013 | |
Claire Lilienthal ES Exterior Wall & Expansion Joint Repairs | 05/15/2013 | 06/05/2013 |
|
05/24/2013 | |
|
05/31/2013 | |
|
05/31/2013 | |
|
05/31/2013 | |
|
06/10/2013 | |
LIGHTSPEED ROCKET SYSTEM
|
05/13/2013 | 05/28/2013 |
STATE AB211 Door Lockset Replacement at Various Sites (BID PACKAGE 1) | 05/07/2013 | 05/28/2013 |
|
05/21/2013 | |
State AB211 Door Lockset Replacement at Various Sites (BID PACKAGE 2) |
05/06/2013 | 05/29/2013 |
|
05/21/2013 | |
Reroofing Project @ Irving M. Scott Building | 04/26/2013 | 05/22/2013 |
Pre-Bid Conference Attendees | 05/08/2013 | |
Bid Results | 05/23/2013 | |
SECURITY SERVICES
|
04/25/2013 | 05/30/2013 |
MEAL DELIVERY SERVICES
|
04/23/2013 | 05/28/2013 |
2340 Jackson Street - 4th Floor Library Voluntary Seismic Upgrade
|
04/23/2013 | 05/15/2013 |
S. F. Community School Exterior Building Envelope Repairs | 04/22/2013 | 05/14/2013 |
Pre-Bid Conference Attendees | 04/30/2013 | |
Addenum No. 1 | 05/09/2013 | |
Bid Results | 05/16/2013 | |
Yick Wo Elementary School Modernization
|
04/23/2013 | 05/21/2013 |
Tennis Court Improvements at Lowell HS | 04/22/2013 | 05/15/2013 |
Pre-Bid Conference Attendees | 05/01/2013 | |
Bid Results | 05/16/2013 | |
Cesar Chavez Elementary School Modernization
|
04/08/2013 | 05/15/2013 |
Rebid - Dr. GW Carver ES and Sutro ES Greening Job Walk Bid Result Subcontractors List |
04/08/2013 | 05/01/2013 |
REVISED Chinese Education Center / Bid Results | ||
(Replacement of Play Yard Surfacing) | 04/03/2013 | 04/03/2013 |
Cisco Network Hardware IFB 2013
|
04/02/2013 | 04/12/2013 |
Marina MS Gym Floor Repair & Refinish Project | 04/02/2013 | 04/30/2013 |
REVISED Marina MS Gym Floor Repair & Refinish Project | 04/04/2013 | 04/30/2013 |
Pre-Bid Attendees | 04/18/2013 | |
Bid Walk Agenda | 04/18/2013 | |
Addendum No. 1 | 04/18/2013 | |
Bid Results | 04/30/2013 | |
Replacement of Play Yard Surfacing Chinese Education Center / Bid Results | 03/07/2013 | 03/07/2013 |
Ruckus Network Hardware IFB Invitation
|
03/26/2013 | 04/05/2013 |
Alamo ES Shade Replacement Addendum 1 Job Walk Bid Result Subcontractors List |
03/22/2013 | 04/30/2013 |
Water Bottle Filling Station Installation at Various School Sites | 03/19/2013 | 04/25/2013 |
Bid Walk Sign In Sheet | 04/03/2013 | |
Job Walk Agenda | 04/03/2013 | |
Addendum No. 1 | 04/15/2013 | |
Bid Results | 04/26/2013 | |
Martin Luther King Middle School and Glen Park Elementary School Boiler Replacement Job Walks Bid Result Subcontractors List |
03/27/2013 | 04/25/2013 |
Re-Bid Glen Park ES and Guadalupe ES Greening Job Walk Bid Result |
03/26/2013 | 04/24/2013 |
Chinese Immersion at William DeAvila Boiler Replacement Job Walk Bid Result |
03/27/2013 | 04/23/2013 |
Interior Improvement at Bret Harte ES | 03/18/2013 | 04/05/2013 |
Pre-Bid Conference Attendees | 03/22/2013 | 03/21/2013 |
Bid Results | 04/05/2013 | 04/05/2013 |
Addendum No. 1 | 04/02/2013 | 04/05/2013 |
Addendum No. 2 | 04/02/2013 | 04/05/2013 |
Reroofing Project @ James Denman MS | 03/18/2013 | 04/09/2013 |
Pre-Bid Conference Attendees | 03/26/2013 | 03/26/2013 |
Bid Results | 04/11/2013 | 04/09/2013 |
Playground Safety Surfacing @ Daniel Webster ES | 03/18/2013 | 04/09/2013 |
Lawton Alternative School Greening Project Job Walk 1 Job Walk 2 Bid Result |
03/13/2013 | 04/24/2013 |
Chinese Education Center Greening Project Job Walk 1 Bid Result |
03/13/2013 | 04/24/2013 |
Bret Harte Early Education School Modernization Job Walk 1 Job Walk 2 Bid Result Subcontractor List |
03/21/2013 | 04/23/2013 |
McAteer Campus - Boiler Replacement Job Walk Bid Result Subcontractor List |
03/13/2013 | 04/09/2013 |
Second Floor Window Replacement At Children Administration Center Addendum number 1 Addendum number 2 Bid Result Subcontractor List |
3/11/2013 | 4/4/2013 |
Pre-Bid Conference Attendees | 03/21/2013 | 04/04/2013 |
Replacement of Play Yard Surfacing for Chinese Education Center - Rebid | 03/11/2013 | 04/03/2013 |
Bid Results | 04/03/2013 | 04/03/2013 |
Increment 2 at Burnett CDC Job Walk 1 Job Walk 2 Addendum no 1 Bid Results |
03/06/2013 | 04/02/2013 |
Bid Result - Increment 2 at Burnett CDC Subcontractors List |
||
Modernization & Interior Improvement Project @ ER Taylor Elementary School | 03/06/2013 | 04/03/2013 |
Pre-Bid Conference Attendees | 03/20/2013 | 03/19/2013 |
Addendum No. 1 | 03/25/2013 | 04/17/2013 |
Addendum No. 2 | 04/09/2013 | 04/23/2013 |
Addendum No. 3 | 04/17/2013 | |
Bid Results | 04/24/2013 | |
ADA Site Improvements of Play Yard @ George W. Carver Elementary School | 03/01/2013 | 03/27/2013 |
Bid Opening Tabulation | 03/27/2013 | 03/27/2013 |
Lowell High School Unit 1, 2, & 3 Voluntary Seismic Strengthening Job Walk 1 Job Walk 2 Bid Results Subcontractors List |
02/21/2013 | 03/21/2013 |
Replacement of Cafeteria Windows & Light Fixtures @ James Denman Middle School | 02/15/2013 | 03/13/2013 |
Bid Results | 03/18/2013 | 03/13/2013 |
GW Carver ES and Sutro ES Greening Project EPA Fact Sheet EPA Firm Application Job Walk 1 Job Walk 2 |
02/13/2013 | 04/03/2013 |
Chinese Immersion and Francis Scott Key ES Greening EPA Lead-Safe Info Sheet EPA Application and Instructions for Firms Job Walk 1 Job Walk 2 Bid Result Subcontractor List |
02/13/2013 | 04/03/2013 |
Thurgood Marshall High School Structural Upgrades | 02/12/2013 | 03/13/2013 |
Job Walk Agenda | 02/27/2013 | 02/26/2013 |
Bid Walk Attendees | 02/27/2013 | 02/26/2013 |
Bid Results | 03/18/2013 | 03/13/2013 |
101Ruth Asawa-School of the Arts Track Improvements | 02/12/2013 | 03/19/2013 |
Bid Walk Agenda | 03/01/2013 | 02/28/2013 |
Sign In Sheet | 03/01/2013 | 02/28/2013 |
Bid Results | 03/19/2013 | 03/19/2013 |
Cleveland ES and Spring Valley ES Greening Project Pre-construction Job Walk Agenda Job Walk 1 Job Walk 2 Bid Result |
02/06/2013 | 03/20/2013 |
Glen Park ES and Guadalupe ES Greening Project Job Walk Agenda Job Walk 1 Job Walk 2 |
02/06/2013 | 03/20/2013 |
Commodore Sloat Auditiorium Flooring | 02/05/2013 | 03/05/2013 |
Job Walk Agenda | 02/14/2013 | 02/14/2013 |
Bid Walk Attendees | 02/14/2013 | 02/14/2013 |
Bid Results | 03/05/2013 | 03/05/2013 |
Wellness Center Project @ Lowell High School | 01/14/2013 | 02/06/2013 |
Bid Results | 02/08/2013 | 02/06/2013 |
2012 Invitations for Bids
Find all the archived Invitations for Bids
Invitation for Bids |
Date Posted |
Open Date |
---|---|---|
Emergency Power System @ John O'Connell HS (REBID) | 11/06/2012 | 11/28/2012 |
Pre-Bid Conference Attendees | 11/15/2012 | 11/14/2012 |
Bid Results | 11/28/2012 | 11/28/2012 |
New Academic Campus @ 300 Seneca--Demolition Package Job Walk 1 Job Walk 2 Addendum 1 Bid Result Subcontractors List |
10/29/2012 | 11/21/2012 |
Jose Ortega Elementary School-Security Camera Project Job Walk 1 Job Walk 2 Bid Result Subcontractors List |
10/24/2012 | 11/21/2012 |
Sarah B. Cooper - Various Improvements Job Walk 1 Job Walk 2 Addendum 1 Bid Result Subcontractors List |
10/24/2012 | 11/20/2012 |
New Willie L. Brown MS Pre-Qualified Design Builders | 10/22/2012 | |
Monroe ES New Modular Two-Story Building Job Walk 1 Job Walk 2 Bid Result Subcontractors List |
10/09/2012 | 10/30/2012 |
Student Nutrition Meal Services IFB Bid Documents Questions & Answers Questions & Answers - Part No. 2 IFB MS-2012 Bid Addendum No. 1 IFB MS-2012 Bid Addendum No. 2 IFB MS-2012 21 Days Menu Cycles IFB MS-25012 Revised Bid Sheets Intent To Award Notice |
10/09/2012
10/26/2012 11/02/2012 11/02/2012 11/02/2012 11/02/2012 11/02/2012 11/30/2012 |
11/13/2012 |
Emergency Power System @ John O'Connell HS |
09/27/2012 |
10/10/2012 |
Pre-Bid Conference Attendees |
09/27/2012 |
09/26/2012 |
Bid Results |
10/15/2012 |
10/10/2012 |
ADA Site Improvements of Play Yard @ Lafayette ES |
9/11/2012 |
10/03/2012 |
Pre Bid Conference Attendees |
9/21/2012 |
9/19/2012 |
Bid Results | 10/9/2012 | 10/3/2012 |
Reroofing Project of Nourse Adutiorium |
8/16/2012 |
9/12/2012 |
Pre-Bid Conference Attendees |
08/30/2012 |
08/29/2012 |
Bid Results |
09/13/2012 |
09/12/2012 |
Ulloa ES Bungalow Replacement Addendum No. 1 Job Walk 1 - 08 09 2012 Job Walk 2 - 08 16 2012 Addendum No. 2 Addendum No, 3 Addendum No, 4 BID DATE CHANGED TO: 8/28/2012 Bid Result Subcontractors List |
7/16/2012 |
8/28/2012 |
Reprographic Services RFP 2012 Addendum Intent to Award Notice |
07/10/2012 08/16/2012 09/26/2012 |
08/21/2012 |
Food and Food Supplies |
7/10/2012 |
8/7/2012 |
Boiler Replacement @ Dr. Charles Drew College Prep Academy / BID RESULTS |
06/21/2012 |
06/08/2012 |
New Computer Labs @ Various Sites/Bid Results |
06/14/2012 |
06/08/2012 |
Student Nutrition Services - Boiler Replacement |
|
|
Bid Results |
6/8/2012 |
6/7/2012 |
Pavement Resurfacing & Repairs @ CDA/Marina Middle School |
5/30/2012 |
5/24/2012 |
Bid Results |
5/30/2012 |
5/24/2012 |
Virco Classroom Furniture Bid Addendum No. 1 Question & Answer (Q&A) Intent to Award Bid Results |
05/22/2012 05/24/2012 05/31/2012 06/12/2012 07/03/2012 |
06/06/2012 |
Cisco Hardware Bid 2012 Addendum No.1 Intent to Award Bid Results |
05/22/2012 05/23/2012 06/11/2012 07/03/2012 |
06/05/2012 |
Roosevelt MS Abatement Project Addendum No. 1 Addendum No. 2 Sign In Sheet Preconstruction Meeting No. 1 Sign In Sheet Preconstruction Meeting No. 2 Bid Result Sub Contractors List |
05/17/2012 | 06/12/2012 |
Willie Brown Jr. MS Demolition Project Job Walk Sign In Sheet Job Walk Sign In Sheet 2 Bid Result Subcontractors List |
5/11/2012 |
6/5/2012 |
Sitework for Placement of New Relocatable Classroom Buildings @ Sunnyside ES |
05/09/2012 |
05/23/2012 |
Pre-Bid Conference Attendees |
05/09/2012 |
05/23/2012 |
Bid Results |
05/24/2012 |
05/23/2012 |
Cleveland and Lakeshore Alternative Elementary School Boiler Replacement Job Walk Sign-In Sheet May 16, 2012 Bid Result |
5/7/2011 |
5/30/2012 |
Water Bottle Filling Station Installation at Six Sites |
4/30/2012 |
05/30/2012 |
Addendum No. 1 |
05/232012 |
05/16/2012 |
Addendum No. 2 |
05/23/2012 |
05/23/2012 |
Bid Results |
06/18/2012 |
06/08/2012 |
Re-bid of ADA Site Improvements of Play Yard & Restroom Renovation @ Frank McCoppin ES |
04/26/2012 |
05/17/2012 |
Pre-Bid Conference Attendees |
05/03/2012 |
05/17/2012 |
Emergency Showers @ Science Classrooms at Lowell High School |
04/23/2012 |
05/02/2012 |
Pre-Bid Conference Attendees |
04/23/2012 |
04/20/2012 |
Bid Results |
05/04/2012 |
05/02/2012 |
Repair of Exterior Walls @ Independence High School |
04/20/2012 |
05/01/2012 |
Pre-Bid Conference Attendees |
04/20/2012 |
04/18/2012 |
Bid Results |
05/01/2012 |
05/01/2012 |
JANITORIAL PAPER & SUPPLIES BID Bid Documents |
04/18/2012 |
05/03/2012 |
Lowell HS- Exterior Painting Project Job Walk 1 Bid Result Subcontractors List Work Preservation Letter |
4/5/2012 |
4/26/2012 |
Buena Vista CDC/Horace Mann MS Renovations for ES Expansion |
04/02/2012 |
04/24/2012 |
Pre-B id Conference Attendees |
04/10/2012 |
04/10/2012 |
Bid Results |
04/26/2012 |
04/24/2012 |
Bid Results (UPDATED) |
05/01/2012 |
04/24/2012 |
Argonne ES ADA Site Improvements of Play Yard |
03/29/2012 |
04/25/2012 |
Pre-Bid Conference Attendees |
04/11/2012 |
04/11/2012 |
SFUSD Flooring Projects at Three Sites |
03/29/2012 |
05/08/2012 |
Bid Walk Agenda |
04/24/2012 |
04/19/2012 |
RUCKUS NETWORK HARDWARE |
|
|
Bid Walk |
04/24/2012 |
04/19/2012 |
Abraham Lincoln HS Increment 3 Project Job Walk Sign In Sheet 1 Job Walk Sign In Sheet 2 Bid Result Subcontractors List
|
3/28/2012 |
4/24/2012 |
SOTA Security Camera System Installation |
03/27/2012 |
05/04/2012 |
Job Walk Agenda |
04/12/2012 |
04/12/2012 |
Sutro ES Exterior & Interior Painting & Flooring Project |
03/27/2012 |
04/18/2012 |
Job Walk #1 |
04/11/2012 |
04/18/2012 |
Job Walk #2 |
04/11/2012 |
04/18/2012 |
Bid Results |
04/19/2012 |
04/18/2012 |
Renovations for SFIHS Expansion |
03/20/2012 |
04/19/2012 |
Pre-Bid Conference Attendees |
04/09/2012 |
04/19/2012 |
Bid Results |
04/20/2012 |
04/19/2012 |
Martin Luther King MS Shade Replacement Project Job Walk 1 |
3/15/2012 |
4/10/2012 |
Luther Burbank/ June Jorden School for Equity Digital Security Project Addendum 1 Addendum 2 Job Walk 1 Job Walk 2 Bid Result |
3/15/2012 |
4/10/2012 |
ADA Site Improvements of Play Yard & Restroom Renovation @ Frank McCoppin ES |
03/09/2012 |
04/03/2012 |
Food & Food Supplies - Student Nutrition Question & Answer |
03/09/2012 04/02/2012 |
04/12/2012 |
Fairmount ES & Grattan ES Greening Sign-In Sheet Sign In Sheet 2 Bid Opening Postponed to April 5, 2012 at 2:00 p.m. (pls see attached email) Bid Result |
3/6/2012 |
3/29/2012 |
Rebid - ADA Site Improvements for Student Nutrition Services Facility |
03/01/2012 |
03/27/2012 |
Bid Results |
03/29/2012 |
03/27/2012 |
Claire Lilientahl ES John Muir ES Greening Sign In Sheet Sign-In Sheet 2 Labor Compliance Program Bid Result |
03/1/2012 |
4/04/2012 |
Dr. William Cobb ES Greening Sign-In Sheet Sign-In Sheet 2 Bid Result Designated Subcontractors List |
3/01/2012 |
03/28/2012 |
Alamo ES & Alice Fong Yu AS Greening Sign-In Sheet Sign In Sheet 2 Labor Compliance Program Bid Result |
03/1/2012 |
03/27/2012 |
Longfellow Building Maintenance & Seismic Strengthening |
02/28/2012 |
03/21/2012 |
Bid Walk Agenda |
03/01/2012 |
03/01/2012 |
Bid Walk No. 1 |
03/02/2012 |
03/01/2012 |
Bid Results |
03/21/2012 |
03/21/2012 |
Play Yard Alterations @ Argonne Child Development Center |
02/22/2012 |
03/22/2012 |
Bid Results |
03/29/2012 |
03/22/2012 |
SFUSD Facilities Design & Construction : SOQ for Architectural Services |
02/21/2012 |
03/20/2012 |
Window Replacement at McKinley ES |
02/07/2012 |
02/28/2012 |
Bid Results |
03/29/2012 |
02/28/2012 |
Pre-Bid Conference Attendees |
02/10/2012 |
02/09/2012 |
Addendum No. 1 |
02/22/2012 |
02/28/2012 |
Addendum No. 2 |
02/22/2012 |
02/28/2012 |
Bid Results |
03/6/2012 |
02/28/2012 |
Voluntary Partial Seismic Strengthening at Daniel Webster ES |
02/07/2012 |
03/07/2012 |
Bid Walk February 15, 2012 |
02/16/2012 |
03/07/2012 |
Job Walk Agenda February 15, 2012 |
02/16/2012 |
03/07/2012 |
Bid Results |
03/08/2012 |
03/07/2012 |
Window Replacement at McKinley ES |
01/26/2012 |
02/28/2012 |
Bid Results |
03/29/2012 |
02/28/2012 |
Chiller Replacement at 555 Franklin St. Administrative Officers , SF CA 94102 |
01/10/2012 |
02/09/2012 |
Bid Results |
02/09/2012 |
02/09/2012 |
ADA Site Improvements for Student Nutrition Services Facility |
01/04/2012 |
02/07/2012 |
Job Walk |
01/18/2012 |
01/17/2012 |
2011 Invitations for Bids
Find all the archived Invitations for Bids
Invitation for Bids |
Date Posted |
Open Date |
---|---|---|
Gateway/Kipp Charter Schools Window Replacement Job Walk 1 Job Walk 2 Bid result Subcontractors List |
12/13/2011 12/21/2011 |
1/10/12 |
Replacement of Entrance Doors at James Denman M.S. |
11/22/2011 | 12/20/2011 |
Bid Results |
01/31/2012 | 12/20/2011 |
Francis Scott Key ES Permanent Modular Classrooms Sign in sheet Sign in sheet 2 Bid Result Subcontractors List |
10/28/2011 | 11/29/2011 |
ADA Site Improvements for Student Nutrition Services Facility |
10/28/2011 |
11/22/2011 |
CISCO NETWORK HARDWARE 2011
|
10/27/2011
|
11/17/2011 |
Roofing Repair at SFUSD Buildings & Grounds Pre-Bid Conference Attendees Bid Walk Agenda & LCP Bid Results 10/05/2011 |
09/21/2011 |
10/05/2011 |
Repair & Maintenance of Kitchen Equipment Intent to Award (11/17/2011) |
9/20/2011 |
10/27/2011 |
Modular Building Installation and other Site Improvements at Horace Mann MS and Bryant ES -Pre-Bid Conference Attendees List -Bid Results - 05/27/2011 |
05/25/2011 |
05/27/2011 |
School Yard Pavement Resurfacing at Various Sites -Bid Results - 6/14/2011 |
05/23/2011 |
06/14/2011 |
Guadalupe ES Modernization Addendum on change of Bid Date to June 16,2011 Job Walk 1 Job Walk 2 Bid Result Subcontractors List |
5/16/2011 |
6/16/2011 |
Bottled Water And Dispenser |
5/16/2011 |
6/7/2011 |
Xerographic Paper Bid |
5/16/2011 |
6/7/2011 |
Reroofing Project at Student Nutrition & June Jordan School of Equity -Bid Results 5/10/2011 |
4./26/2011 |
5/10/2011 |
Abraham Lincoln HS Fire Sprinkler Modification Job Walk 1 Job Walk 2 Bid Result |
5/11/2011 |
6/02/2011 |
Junipero Serra EMS Replacement -Bid Walk Agenda 5.10.2011 -Bid Walk Sign-In Sheet 5.10.2011 -Bid Result 5.27.2011 |
4/29/2011 |
5/27/2011 |
Therapy Bus Transportation Service
|
4/29/2011 |
6/1/2011 |
Civic Center Secondary School At John Swett Campus Modernization Job Walk 1 Job Walk 2 Result Subcontractors List |
4/21/2011 |
5/24/2011 |
555 Franklin St. Cooling Tower and Sump Pump Replacement |
||
George Washington, West Portal ES, Rosa Park Structural Upgrade Job Walk Job Walk 2 Addendum 2 Package 2 Bid Result Subcontractors List |
04/14/2011 |
04/28/2011 |
Flooring Project -- Package 1 : Garfield, Ida B. Wells, and Sunnyside - Bid Results 05/04/2011 |
04/05/2011 |
05/04/2011 |
Argonne ES, El Dorado ES, Independence HS Ext. Ptg. Revised - Bid Results 4/21/2011 |
03/29/2011 |
04/21/2011 |
Dr. Charles Drew ES Structural Upgrade Job Walk Result Subcontractors List |
03/28/2011 |
04/14/2011 |
Leonard R. Flynn ES Painting and Resurfacing Play Yards
|
03/29/2011 |
04/05/2011 |
Hilltop HS Modernization
|
03/08/2011 |
04/07/2011 |
Balboa HS, James Denman MS, Thurgood Marshall Greening Project
|
03/01/2011 |
04/06/2011 |
Civic Center Secondary School Demolition and Abatement Project
|
03/22/2011 | 04/05/2011 |
AP Giannini MS, Lincoln HS and Lowell HS Greening
|
02/25/2011 |
04/05/2011 |
Painting & Resurfacing Play Yards @ L.R. Flynn ES |
03/04/2011 |
04/05/2011 |
2340 Jackson Street School Modernization
|
03/03/2011 |
03/31/2011 |
Aptos MS Increment 2
|
03/08/2011 |
03/31/2011 |
Everett MS, Galileo MS, Horace Mann MS & Mission HS Greening Project
|
02/28/2011 |
03/31/2011 |
Creative Arts Charter School Modernization
|
02/24/2011 |
03/29/2011 |
Ulloa Digital Security Project
|
02/24/2011 |
03/29/2011 |
Francisco Middle School Modernization
|
02/23/2011 |
03/24/2011 |
Lowell HS Stadium Track and Field Improvements
|
02/18/2011 |
03/24/2011 |
Sunset ES & Mission Education Center Greening Project
|
02/23/2011 |
03/24/2011 |
Buena Vista ES Greening Project
|
02/18/2011 |
03/23/2011 |
Guadalupe ES Interim Housing
|
02/24/2011 |
03/22/2011 |
Spring Valley ES Increment 2
|
02/24/011 |
03/22/2011 |
John O'Connell Technical High School - Career Technical Education Facilities - Bid Result 07/17/2011 |
02/14/2011 |
03/17/2011 |
Marshall, Jefferson & Sanchez Greening Project
|
02/23/2011 |
03/17/2011 |
Rebid of Gateway and KIPP Charter @ 1430 Scott
|
|
03/17/2011 |
Cisco Network Hardware IFB
|
01/26/2011 |
02/18/2011 |
Chinese Immersion School at the DeAvila Modernization
|
01/14/2011 |
02/17/2011 |
Cleveland ES Replaster Project
|
01/14/2011 |
02/16/2011 |
Civic Center Secondary School Interim Housing @ 300 Seneca
|
01/11/2011 | 02/15/2011 |
1360 43rd Avenue Modernization - Project Cancelled
|
01/14/2011 | 02/12/2011 |
School Yard Pavement Resurfacing @ Balboa HS + Gordon Lau ES
|
02/10/2011 | 02/09/2011 |
Francis Scott Key ES Rebid
|
01/13/2011 | 02/08/2011 |
New Music Program Renovation @ School of the Arts
|
01/03/2011 | 02/08/2011 |
Presidio CDC Modernization
|
01/10/2011 | 02/03/2011 |
Intel Classroom NL2 Pro Network IFB
|
01/04/2011 | 01/18/2011 |
2010 Invitations for Bids
Find all the archived Invitations for Bids
Invitation for Bids |
Date Posted |
Open Date |
---|---|---|
Francis Scott Key ES Modernization: Bids Rejected - Project to Be Rebid
|
12/14/2010 | 01/11/2011 |
Window Replacement Project @ Alvarado ES
|
11/10/2010 | 12/21/2010 |
Windows & Doors Replacement Project at Miraloma ES
|
11/03/2010 | 12/16/2010 |
2340 Jackson Street Interim Housing Project
|
11/18/2010 | 12/14/2010 |
1350 7th Avenue School Modernization
|
12/20/2010 | 1/25/2011 |
Gateway/KIPP Charter School - 1430 Scott St. Modernization - Project Rebid 1/24/2011
|
12/13/2010 | 01/19/2011 |