CUPCCAA Invitations for Bids

CUPCCAA Invitations for Bids Link to this section

Ida B. Wells High School, Removal of Tiled Wall Mural - Project No. 12436

Date posted: 10/04/2024

Buena Vista Horace Mann K-8 Footing Repair - Project No. 11959

Date posted: 09/10/2024

Alamo Elementary School, Removal of Two (2) Portable Buildings - Project No. 12403

Date posted: 06/04/2024

Sanchez Elementary School, UPS for VOIP - Project No. 11542

Date posted: 06/04/2024

Sunset Elementary School, UPS for VOIP - Project No. 11542

Date posted: 06/04/2024

Bessie Carmichael Elementary School, UPS for VOIP - Project No. 11542

Date posted: 05/21/2024

Galileo HS, Balboa HS, George Moscone ES, Mission Education Center ES, Remote Door Access System Upgrades - Package 5, Project No. 11970

     Date posted: 05/10/2024

New Traditions Creative Arts Elementary School - Play Yard Wooden Fence Replacement, Project No. 12404

     Date Posted: 05/03/2024

E.R. Taylor Elementary School and Bryant Elementary School - Water Outlets Remediation, Project No. 12352

     Date Posted: 05/03/2024

Dr. George Washington Carver Elementary School and Grattan Elementary School - Water Outlets Remediation, Project No. 12352

     Date Posted: 05/03/2024

Tule Elk Park Early Education School - Technology Upgrades , Project No. 12386

     Date Posted: 05/01/2024

Sunset Elementary School - Play Yard Chain Link Fence Replacement, Project No. 12402

     Date Posted: 03/26/2024

George Washington High School - Roof Replacement of Portable #3 and Portable #4, Project No. 12363

     Date Posted: 03/29/2024

Sanchez Elementary School - Kiln Room, Project No. 12293

     Date Posted: 03/29/2024

Lowell High School - Main Building Roof Flashing Repairs, Project No. 12408

    Date Posted: 03/26/2024

Junipero Serra Elementary School - Repainting Project, Project No. 12376

     Date Posted: 03/19/2024

Balboa High School - Gymnasium Floor Refinish, Project No. 175

     Date Posted: 03/06/2024

Sherman Elementary School - Play Yard Resurfacing, Project No. 12399

     Date Posted: 03/06/2024

Argonne Early Education School, Jean Parker Elementary School & Commodore Sloat Elementary School Hand Washing Sink Upgrades Package 3B, Project No. 11607

     Date Posted: 02/28/2024

Clair Lilienthal Elementary School (Madison Campus) Hand Washing Sink Upgrades Package 3A, Project No. 11607

     Date posted: 02/27/2024

Alvarado Elementary School - Construction of Two (2) Shade Structures, Project No. 12360

     Date posted: 02/26/2024

Commodore Sloat Elementary School - Exterior Exit Gates, Project No. 12348

     Date posted: 02/26/2024

Balboa High School - Shade Structures for Outdoor Fitness Area, Project No. 175

     Date posted: 02/20/2024

Zaida T. Rodriguez Early Education School, George Moscone Elementary School & Phillip and Sala Burton High School - SNS Hand Washing Sink Upgrades Package No. 2, Project No. 11607

     Date posted: 02/22/2024

John Muir ES, Independence HS, Jefferson EES, Noriega EES, Miraloma ES, Herbert Hoover MS, Remote Door Access System Upgrades - Package 4, Project No. 11970

     Date posted: 02/13/2024

Monroe Elementary School - Accessible Site Improvements of Play Yard, Project No. 12356

     Date posted: 01/29/2024

Commodore Stockton Child Development Center & Rooftop Elementary School - SNS Hand Washing Sink Upgrades Package No. 1, Project No. 11607

Date posted: 1/24/2024

Balboa High School - Gymnasium Lighting Replacement, Project No. 12359

     Date posted: 10/31/2023

Yick Wo ES, Gordon J. Lau ES, Ida B. Wells HS, McAteer Campus, Downtown HS, Remote Door Access System Upgrades - Package 3, Project No. 11970

Date posted: 10/25/2023

San Miguel EES, Former City Arts & Tech, Dolores Huerta ES, Junipero Serra Annex EES, Bret Harte ES, Remote Door Access System Upgrades - Package 2a, Project No. 11970

Date posted: 09/18/2023

Mission High School - Parking Lot Pedestrian Ramp Repairs, Project No. 12357

     Date posted: 09/12/2023

Phillip and Sala Burton Academic School, Dr. Martin Luther King Jr Academic MS, Willie L. Brown Jr. MS, Thurgood Marshall Academic HS, Remote Door Access System Upgrades - Package 1C, Project No. 11970

Date posted: 08/17/2023

Gloria R. Davis Campus / 1195 Hudson Senior Center - Sewer Repair / Replacement, Project No. 12353

     Date posted: 07/17/2023

Rosa Parks Elementary School - Sewer Repair / Replacement, Project No. 12330

     Date posted: 05/12/2023

Presidio Middle School - Sewer Repair / Replacement, Project No. 12329

     Date posted: 05/12/2023

Lakeshore Alternative Elementary School - Sewer Repair / Replacement, Project No. 12331

     Date posted: 05/12/2023

Herbert Hoover Middle School - Sewer Repair / Replacement, Project No. 12328

     Date posted: 05/12/2023

Claire Lilienthal Elementary School, Madison Campus - Repair of Concrete Wall and Fence, Project No. 12323

     Date posted: 05/01/2023

Visitacion Valley Middle School - Ceramics Kiln Installation, Project No. 12293

     Date posted: 05/01/2023

Everett Middle School - Ceramics Kiln Installation, Project No. 12293

     Date posted: 05/01/2023

AP Giannini MS Exterior Maintenance Door Replacement Project, Project No. 11897

    Date posted: 04/20/2023

Galileo Academy of Science and Technology - Small Gym Exterior Wall Repairs and Gutter, Project No. 12320

     Date posted: 4/12/2023

Lawton Elementary School - Boiler #2, Boiler Sections Replacement, Project No. 12315

      Date posted: 04/04/2023

Gloria R. Davis Middle School - Boiler #2, Boiler Sections Replacement, Project No. 12314

      Date posted: 04/04/2023

Alvarado Elementary School - Boiler #2, Boiler Sections Replacement, Project No. 12316

      Date posted: 04/04/2023

Thomas Edison Charter Academy - Boiler #2, Boiler Sections Replacement, Project No. 12319

      Date posted: 04/04/2023

Galileo Academy of Science and Technology - Small Gym Floor Replacement, Project No. 12320

     Date posted: 3/21/2023

Malcolm X Academy - Rubber Safety Surfacing Tiles, Project No. 12312

     Date posted: 3/31/2023

Jefferson Early Education School - Rubber Safety Surfacing Tiles, Project No. 12327

     Date posted: 3/31/2023

E.R. Taylor Elementary School  - Acoustical Ceiling At Classroom 17, Project No. 12332

     Date posted: 3/22/2023

Galileo Academy of Science and Technology - Skylight Replacement, Project No. 12325

      Date posted: 3/13/2023

Sanchez Elementary School - Play Structure Rubber Mat Replacement, Project No. 12326

     Date posted: 03/06/2023

Presidio Middle School - Roof Gutter and Downspout Repairs and Replacement, Project No. 12324

     Date posted: 03/02/2023

Willie Brown Middle School Gate Replacement Project

     Date posted: 03/01/2023

Alice Fong Yu Alternative School - Deck Coating Replacement, Project No. 12289

      Date posted: 02/28/2023

Miraloma Elementary School - Ceramics Kiln Installation, Project No. 12293

      Date posted: 02/28/2023

Cafeteria Painting and Carpentry Work - 8 Schools, Project  #11900

      Date posted: 02/22/2023

Buena Vista Horace Mann - Interim Public Address System Improvements Project

      Date posted: 11/01/2022

James Lick MS, Paul Revere ES, Presidio MS, Roosevelt MS and Ruth Asawa School of the Arts - Security Lockset Replacement, Package 4, Project No. 11917

      Date posted: 9/7/2022

George Washington High School - Bleacher Railing Repairs and Painting, Project No. 12307

      Date posted: 8/22/2022

Bessie Carmichael Elementary School and Bessie Carmichael Middle School - Security Lockset Replacement, Package 1, Project No. 11888

       Date posted: 8/9/2022

REBID2: Buena Vista Horace Mann (BVHM) North Courtyard Play Yard Painting, Project No. 11959

       Date posted: 06/10/2022

Galileo Academy of Science and Technology - Bleacher Building Repairs, Waterproofing Work, Project No. 12275

       Date posted: 5/25/2022

Galileo Academy of Science and Technology - Bleacher Building Repairs, M.E.P. Work, Project No. 12275

       Date posted: 5/24/2022

Buena Vista Horace Mann (BVHM) North Courtyard Play Yard Painting, Project No. 11959

       Date posted: 05/03/2022

San Miguel Early Education School - South Curtain Wall Shade Installation, Project No. 12302

      Date posted: 4/15/2022

Ulloa Elementary School - REBID Accessible Site Improvements of Play Yard, Project No. 12297

      Date posted: 4/11/2022

Buena Vista Horace Mann Academic Middle School - Electrical Survey and Phone Line Installation, SFUSD Project

      Date posted: 4/1/2022

West Portal Elementary School - Accessible Site Improvements of Play Yard, SFUSD Project No. 12298

      Date posted: 3/28/2022

Ulloa Elementary School - Accessible Site Improvements of Play Yard, Project No. 12297

      Date posted: 3/22/2022

Buena Vista Horace Mann - Ceiling Tiles Replacement, Project No. 11959

      Date posted: 2/10/2022

George Peabody Elementary School - Play Yard Resurfacing, Project No. 12290

      Date posted: 2/8/2022

Guadalupe Elementary School - Roofing Repairs of Modular Buildings, Project No. 12252

      Date posted: 2/7/2022

Balboa High School - Audio-Visual Equipment, Project No. 12160

      Date posted: 2/1/2022

Alice Fong Yu Alternative School - Gate and Bench Installation, Project No. 12279

      Date posted: 1/13/2022

Guadalupe Elementary School - Roofing Repairs of Modular Buildings, Project No. 12252

      Date posted: 11/12/2021

Dolores Huerta Elementary School - Accessible Site Improvements of Play Yard, Project No. 12278

      Date posted: 11/10/2021

Jefferson Elementary School - Modular Roof Repairs, Project No. 12253

      Date posted: 11/2/2021

Ceramic Kilns Installations at James Lick Middle School (Project No. 11842) and Willie Brown Middle School (Project No. 12230)

      Date posted: 11/1/2021

Willie M. Brown Middle School - Water Remediation Project, Project No. 12265

     Date posted: 10/20/2021

Jose Ortega Elementary School - Accessible Site Improvements of Play Yard, Project No. 12267

     Date posted: 9/27/2021

June Jordan School for Equity - Gym Ceiling Installation, Project No. 12270

     Date posted: 9/21/2021

Herbert Hoover Middle School - Boiler #1 and #2, Boiler Sections Replacement

     Date posted: 8/25/2021

Room 124 Repairs at SFUSD Office Building, 135 Van Ness Avenue, Project No. 12272

     Date posted: 8/11/2021

School of the Arts (SOTA) - Flooring Replacement

     Date posted: 7/27/2021

Claire Lilienthal (Scott Campus) School - Exterior Mechanical Unit Sound Barrier

     Date posted: 7/21/2021

Claire Lilienthal Scott Campus Summer Project - REBID

     Date posted: 06/10/2021

SOTA Air Balancing Project

     Date posted:  5/26/2021

George Washington High School - Tennis Courts Improvements, SFUSD Project No. 12262

     Date posted: 5/24/2021

Lowell High School - Security Access Improvements, SFUSD Project No. 12263

     Date posted: 5/21/2021

Claire Lilienthal Scott Campus Summer Projects

     Date posted: 5/19/2021

Jefferson Elementary School - Roof Repairs, SFUSD Project No. 12253

     Date posted: 5/10/2021

Lowell High School - State A.B. 211 Door Lockset Replacement Project, SFUSD Project No. 12260

     Date posted: 4/28/2021

SFUSD Budget Office - Roof Repairs, SFUSD Project No. 12250

    Date posted: 4/14/2021

June Jordan School for Equity - Accessible Ramp at Play Yard and Learning Garden, SFUSD Project No. 11953

    Date posted: 4/20/2021

Guadalupe Elementary School - Roofing Repairs of Modular Buildings

    Date posted: 4/8/2021

E.R. Taylor Elementary School - RE-BID of A.D.A. Site Improvement of Play Yard, SFUSD Project No. 12239

    Date posted: 3/30/2021

Cafeteria Painting - Group 7, SFUSD Project No. 12182

    Date posted: 3/5/2021

E.R. Taylor Elementary School - A.D.A. Site Improvement of Play Yard, SFUSD Project No. 12239

     Date posted: 2/25/2021

Balboa High School - Vacuum Boiler Feedwater System Replacement

     Date posted: 2/17/2021

601 McAllister Street, 2nd Floor Conference Room - Lighting Upgrade

     Date posted: 1/20/2021

Buena Vista Horace Mann K-8 Community School - Boiler #1, Boiler Sections & Base Replacement

     Date posted: 1/20/2021

George Washington High School - Fencing Project for Batting Cage Building

     Date posted: 11/17/2020

George Moscone Elementary School - Play Mat Replacement

     Date posted: 10/07/2020

2/14/2017 

Cafeteria Painting Project at Galileo HS & Dr. Charles Drew ES 

01/27/2017 02/14/2017

Alteration of Restrooms at Miraloma ES 

01/26/2017 02/10/2017 

Security Fence Repairs & Replacement at June Jordan School for Equity 

01/24/2017 02/07/2017 

West Portal Yard #4 Improvements

01/10/2017 01/25/2017

Tule Elk Park EES  Controlled Demolition

12/09/201612/23/2016

Elevator Modernization Project at 601 McAllister Street

12/09/2016 12/22/2016 

Security Upgrades of Property Gates at Student Nutrition Services Facility

11/18/201612/02/2016 

Fence Repair Project at 1350 7th Avenue

09/15/201609/27/2016

John O'Connell HS -  Library Improvements Project 

08/31/2016 09/21/2016 

Ceramics Kiln Installations at Various Sites, Pkg 2 

07/28/2016 08/11/2016 

George Washington High School Computer Classroom SH5 

07/21/2016 08/02/2016 

Doorbell Entry System and Door/Gate Replacement Project at George Peabody & Clarendon Ellementary Schools 

07/12/2016 08/02/2016 

Doorbell Entry System & Door/Gate Replacement Project at Leonard Flynn & John Muir Elementary Schools 

07/12/2016 08/02/2016 

Thomas Edison Charter Academy (TECA) Sewer Repair

07/22/201607/29/2016

 Utility Ramps and Drainage Improvement Project at Alvarado Elementary School

 07/15/2016 07/26/2016

Lower Roof Repairs at Thurgood Marshall High School Gym

07/08/2016 07/21/2016 

2nd Floor Carpet Replacement Project @ 555 Franklin Street

05/20/2016 06/01/2016

John McLaren EES - Roof Replacement

05/19/201606/02/2016

Administration & Counselling Offices Floor Replacement Project @ John O'Connell High School 

05/16/2016 05/27/2016 

Willie L. Brown Jr. Middle School Sidewalk and Fence Project

05/16/201605/26/2016

Cleveland ES - Replacement of Fence Grills

05/04/201605/19/2016

Replacement of Gym Divider Curtain @ Hoover Middle School & Washington High School 

04/28/201605/17/2016 

McKinley Elementary School Play Yard Upgrade

05/03/201605/12/2016

Security Camera System Project @ Mission Education Center Elementary School 

04/19/2016 05/05/2016 

Security Camera System Project @ Tule Elk Park Early Education School 

04/19/2016 05/05/2016 

Playground Safety Surfacing Project @ Dianne Feinstein Elementary School

04/20/201604/29/2016

Playground Resurfacing & Yard Modifications Project @ Guadalupe Elementary School

04/12/2016 04/28/2016 

Playstructure Matting & Office Flooring Replacement Project at Tenderloin Elementary School 

03/30/2016 04/12/2016 

Junipero Serra ES Demolition Project

03/29/201604/19/2016

Daniel Webster Interim Housing at Enola Maxwell Removal Project

03/23/201604/13/2016

Yick Wo ES Green Schoolyard

03/14/201604/05/2016

George Peabody ES Green Schoolyard

03/14/201604/05/2016

McKinley Elementary School Upgrade

03/15/201604/05/2016

 3rd Floor Carpet Replacement Project at 555 Franklin St.

 01/28/2016 02/09/2016

Cesar Chavez Elementary School - Window Shades Installation

01/29/201602/09/2016

This page was last updated on October 23, 2024